An overview of concrete piles cost

When it comes to estimating costs for concrete pin piles, one has to cover costs for materials and equipment, labor and overheads. All foundations need to be below the level of the lowermost floor. For example, if there is a basement in the building, the basement floor is considered the lowest floor. These costs need to include the costs of the concrete piles. Specific foundation costs will rely on the number and kind of piles used. It is often seen that the most cost effective solution lies in using Driven piles as you know what you are paying for.

Wide range of materials and shapes

Today, there is a tremendous range of materials and shapes available in piles that can be easily fabricated to add to the structural strength. Static or dynamic pile testing can be used to determine the Pile capacity which can be optimized to create the required capacity precisely. The pilings and special foundations are priced as an addition to the foundation costs. The costs of working with piles rely on the size of equipment required and the difficulty in the task. Smaller projects may cost just a few hundred dollars while a major project can cost twice the average.

The installation costs of light residential piles can be as low as $3 per linear foot and go as high as $10 per linear foot. Pre-cast concrete piles are the most commonly used concrete piles because of their ready availability, custom lengths and relatively low material cost. The cost of concrete pile can differ because of dimensions and length required, the design loads and load bearing capacity required. The concrete piles can be made from driving in within two weeks as compared to steel piles that can take anywhere from six to eight weeks.

It is observed that the Steel pipe piles carry the highest unit costs while the costs for the PPC piles are lower. The unit costs decrease with the increasing size of the contract. The concrete piles can be square, cylinder, octagonal and in sheet pile. Makes sure that there no delays related to the curing of concrete. To minimize any disturbance in wetlands, those piles can be used with construct temporary trestles to meet the need of any temporary construction. The installed piles can be extracted when there is no need. However, one will need large diameter concrete piles in the earthquake-prone regions, and those can raise the costs. Coatings are applied on the piles to enhance their service life and mitigate the effects of corrosion and negative skin friction. Select the concrete piles carefully, based on their number required, the length of penetration and the pile weight.

Contractors for Pile driving can be found all over the country. Hire experienced mechanics and technicians with the right knowledge of soil mechanics to save both on time and money and avoid expensive delays. Make sure that the installation methods and the equipment being used are time-tested and well proven. Improve the efficiency of concrete piles with the use of right equipment, methods and continual testing.